A child applies a force Fparallel to the x-axis to a 10.0kg sled moving on the frozen surface of a small pond. As the child controls the speed of the sled, the x-component of the force she applies varies with the x-coordinate of the sled as shown in Fig. E6.36. Calculate the work done by Fwhen the sled moves

(a) from x=0to x=8.0m;

(b) fromx=8.0mto x=12.0m;

(c) fromx=0mto x=12.0m.

Short Answer

Expert verified
  1. The work done by the force on the sled when it moves from x=0to x=8mis 40J.
  2. The work done by the force on the sled when it moves from x=8mto x=12mis 20 J .
  3. The work done by the force on the sled when it moves from x=0mto x=12mis 60 J.

Step by step solution

01

Identification of given data

The given data can be listed below,

  • The mass of the child is, m=10kg.
  • The maximum height of the triangle is, h=10m.
02

Concept/Significance of work done.

If a body really moves a certain distance in the direction of the applied force, such movement is considered to constitute work. The dot product of force time distance is known as work.

03

(a) Determination of the work done by F→ when the sled moves from x=0 to x=8.0 m

When x rises during the displacement, the work done is positive is given by,

W=12b×h

Here, b is the base of the triangle, and h is the height of the triangle.

Substitute all the values in the above from the graph,

W=128m10N=40N.m1J1N·m=40J

Thus, the work done by the force on the sled when it moves fromx=0 tox=8m is 40 J .

04

(b) Determination of the work done by F→ when the sled moves from x=0 m to x=12.0 m

When x rises during the displacement, the work done is positive is given by,

W=12b×h

Here, b is the base of the triangle, and h is the height of the triangle.

Substitute all the values in the above from the graph,

W=124m10N=20N·m1J1N·m=20J

Thus, the work done by the force on the sled when it moves fromx=8m tox=12m is 20 J.

05

(c) Determination of the work done by F→ when the sled moves from x=0 m to x=12.0 m

When x rises during the displacement, the work done is positive is given by,

W=12b×h

Here, b is the base of the triangle, and h is the height of the triangle.

Substitute all the values in the above from the graph,

W=1212m10N=60N·m1J1N·m=60J

Thus, the work done by the force on the sled when it moves from x=0mto x=12mis 60 J .

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

See all solutions

Recommended explanations on Physics Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free