Warning: foreach() argument must be of type array|object, bool given in /var/www/html/web/app/themes/studypress-core-theme/template-parts/header/mobile-offcanvas.php on line 20

To push a 25.0 kg crate up a frictionless incline, angled at 25.0°to the horizontal, a worker exerts a force of 209 N parallel to the incline. As the crate slides1.50 m, how much work is done on the crate by (a) the worker’s applied force, (b) the gravitational force on the crate, and (c) the normal force exerted by the incline on the crate? (d) What is the total work done on the crate?

Short Answer

Expert verified
  1. Work done by the applied force is 314 J
  2. Work done by the gravitational force is -155 J
  3. Work done by the normal force is 0 J
  4. Total work done is 158.5 J

Step by step solution

01

Given information

It is given that,

Mass of the crate is m=25 kg

Applied force is Fapp=209N.

The angle between applied force and horizontal isθ=25°

Horizontal displacement isd=1.50m.

02

Determining the concept

The problem deals with the work done which is the fundamental concept of physics.Work is the displacement of an object when force is applied on it.To solve this problem, use,

  • X and y components of the force
  • Concept of variable forces
  • Work-force relation

Formulae:

The work done in general is given by

W=F.dcosϕ …(i)

Where,Fis force, dis displacement and ϕis the angle between F and d.

The net work done is given by,

Wnet=Wn+Wapp+Wg …(ii)

03

(a) Determining the work done by the applied force (Wapp)

With the notation used in equation (i) the work done by the applied force is given by,

Wapp=Fapp.dcosϕ=209N×1.50m×cos(0)=313.5J314J

Hence, the work done by the applied force is 314J

04

(b) Determining the work done by gravitational force (Wg)

Wg=Fg.dcosϕ

The angle between the x-component of the gravitational force and displacement d is

ϕ=180°

role="math" localid="1657180276736" Wg=mgsinθ×d×cos(180)=25kg×9.8m/s2×sin(25)×1.50m×cos180=25kg×9.8m/s2×(0.4226)×1.50m×(-1)=-155.3122J-155.0J

Hence, the work done by the gravitational force is -155 J

-

05

(c) Determining the work done by the normal (WN)

WN=N.dcosϕ

role="math" localid="1657180592406" Normalforceisperpendiculartothedisplacementd.Hence,ϕ=90°WN=N.dcosϕ=0

Hence, the work done by the normal force is 0 J

06

(d) Determining the total work done (Wnet)

Using equation (ii) the work done is given by

Wnet=-155+0+313.5=158.5J

Hence, the total work done is 158.5 J

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

A glob of slime is launched or dropped from the edge of a cliff. Which of the graphs in figure 7-22 could possibly show how the kinetic energy of the glob changes during its flight?

Figure 7-21ashows four situations in which a horizontal force acts on the same block, which is initially at rest. The force magnitudes are F2=F4=2f1=2F3. The horizontal component vXof the block’s velocity is shown in figure 7-21bfor the four situations. (a) Which plot in figure 7-21b best corresponds to which force in fig. 7-21a? (b) Which plot in figure 7-21c (for kinetic energy K versus time t) best corresponds to which plot in fig. 7-21b ?

A spring with a spring constant of 180N/cmhas a cage attached to its free end. (a) How much work does the spring force do on the cage when the spring is stretched from its relaxed length by7.60mm? (b) How much additional work is done by the spring force when the spring is stretched by an additional7.60mm ?

In Fig.7-10 , we must apply a force of magnitude to hold the block stationary at x=-2.0cm. From that position, we then slowly move the block so that our force does +4.0J of work on the spring–block system; the block is then again stationary. What is the block’s position? (Hint:There are two answers.)

A block is sent up a frictionless ramp along which an x axis extends upward. Figure 7-31gives the kinetic energy of the block as a function of position x; the scale of the figure’s vertical axis is set byKs=40.0J. If the block’s initial speed is 4.00m/swhat is the normal force on the block?

See all solutions

Recommended explanations on Physics Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free