Chapter 13: Problem 6
13.6D A factory requires \(3750 \mathrm{~kW}\) of electric power and highquality steam at \(107^{\circ} \mathrm{C}\) with a mass flow rate of \(2.2 \mathrm{~kg} / \mathrm{s}\). Two options are under consideration: Option 1: A single boiler generates steam at \(2.0 \mathrm{MPa}, 320^{\circ} \mathrm{C}\), supplying a turbine that exhausts to a condenser at \(0.007\) MPa. Steam is extracted from the turbine at \(107^{\circ} \mathrm{C}\), returning as a liquid to the boiler after use. Option 2: A boiler generates steam at \(2.0 \mathrm{MPa}, 320^{\circ} \mathrm{C}\), supplying a turbine that exhausts to a condenser at \(0.007 \mathrm{MPa}\). A separate process steam boiler generates the required steam at \(107^{\circ} \mathrm{C}\), which is returned as a liquid to the boiler after use. The boilers are fired with natural gas and \(20 \%\) excess air. For \(7200 \mathrm{~h}\) of operation annually, evaluate the two options on the basis of cost.
Short Answer
Step by step solution
Key Concepts
These are the key concepts you need to understand to accurately answer the question.