Chapter 12: Problem 83
To manufacture an automobile requires painting, drying, and polishing. Epsilon Motor Company produces three types of cars: the Delta, the Beta, and the Sigma. Each Delta requires 10 hours (h) for painting, 3 h for drying, and \(2 \mathrm{~h}\) for polishing. A Beta requires \(16 \mathrm{~h}\) for painting, \(5 \mathrm{~h}\) for drying, and \(3 \mathrm{~h}\) for polishing, and a Sigma requires \(8 \mathrm{~h}\) for painting, \(2 \mathrm{~h}\) for drying, and \(1 \mathrm{~h}\) for polishing. If the company has \(240 \mathrm{~h}\) for painting, \(69 \mathrm{~h}\) for drying, and \(41 \mathrm{~h}\) for polishing per month, how many of each type of car are produced?
Short Answer
Step by step solution