What is the “three-position” scheme for MV switchgear? Describe the interlocking of the three positions.
Short Answer
The three position schemes and their interlocking position is explained.
Chapter 9: 1CSQ (page 590)
What is the “three-position” scheme for MV switchgear? Describe the interlocking of the three positions.
The three position schemes and their interlocking position is explained.
All the tools & learning materials you need for study success - in one app.
Get started for freeAt the general three-phase bus shown in Figure 9.7(a) of the text, consider a simultaneous single line-to-ground fault on phase a and line-to-line fault between phases and , with no fault impedances. Obtain the sequence-network interconnection satisfying the current and voltage constraints.
The first step in power-system fault calculations is to develop sequence networks based on the single-line diagram of the system, and then reduce them to their Thévenin equivalents, as viewed from the fault location.
(a) True (b) False
For power-system fault studies, it is assumed that the system is operating under balanced steady-state conditions prior to the fault, and sequence networks are uncoupled before the fault occurs.
(a) True (b) False
Equipment ratings for the four-bus power system shown in Figure 7.14 are given as follows:
Generator
Generator
Generator
Transformer
Transformer
Transformer
Each line:
The inductor connected to generator neutral has a reactance of . Draw the zero, positive, and negative-sequence reactance diagrams using a base in the zone of generator. Neglect transformer phase shifts.
Describe the shielded solid insulation system in MV switch gear.