Chapter 3: Q35P (page 151)
Consider a bank of three single-phase two-winding transformers whose high-voltage terminals are connected to a three-phase,feeder. The low-voltage terminals are connected to a three-phase substation load ratedand. Determine the required voltage, current, andratings of both windings of each transformer, when the high-voltage/low-voltage windings are connected (a), (b), (c), and (d).
Short Answer
(a)Therating of thetransformer is and .
(b)Therating of thetransformer is and .
(c)Therating of thetransformer is and .
(d) Therating of thetransformer is and .