Chapter 12: Q14P (page 775)
A power system consists of two interconnected areas. Area 1 has of generation and an area frequency response characteristic . Area 2 has of generation and . Each area is initially operating at one-half its total generation, at and at , when the load in area 1 suddenly increases by . Determine the steady-state frequency error and the steady-state tie-line error of each area. Assume that the reference power settings of all turbine-governors are fixed. That is, LFC is not employed in any area. Neglect losses and the dependence of load on frequency.
Short Answer
The steady state frequency error is . The steady state tie line error for area 1 and 2 are and respectively.