Chapter 14: Q2P (page 914)
What is the most common type of grounding on primary distribution systems ?
Short Answer
The most common type of grounding is three phase four wire system.
Chapter 14: Q2P (page 914)
What is the most common type of grounding on primary distribution systems ?
The most common type of grounding is three phase four wire system.
All the tools & learning materials you need for study success - in one app.
Get started for free(a) How many Mvars of shunt capacitors are required to increase the power factor on a 10 MVA load from 0.85 to 0.9 lagging? (b) How manyMvars of shunt capacitors are required to increase the power factor on a 10 MVA load from 0.90 to 0.95 lagging? (c) Which requires more reactive power, improving a low power-factor load or a high power-factor load?
Table 14.10 gives annual outage data (sustained interruptions) from a utilityโs CIS database for feeder . This feeder serves customerswith a total load of . Table 14.10 includes a major event that began on 04/11/2010 with customers out of service for approximately six days (minutes) due to an ice storm. Momentary interruption events (less than five minutesโ duration) are excluded from Table 14.10. Calculate the SAIFI, SAIDI, CAIDI, and ASAI for this feeder: (a) including the major event; and (b) excluding the major event.
Table 14.10
Outage data | Time at beginning of outage | Outage duration (minutes) | circuit | Number of customers interrupted |
1/15/2010 | 01:24:20 | 14.4 | 8050 | 342 |
4/4/2010 | 08:14:20 | 151.2 | 8050 | 950 |
7/08/2010 | 07:15:46 | 89.5 | 8050 | 125 |
9/08/2010 | 15:45:39 | 654.6 | 8050 | 15 |
10/11/2010 | 07:40:59 | 32.7 | 8050 | 2,200 |
11/04/2010 | 22:30:00 | 10,053* | 8050 | 4,000 |
12/01/2010 | 14:18:07 | 40 | 8050 | 370 |
What are the advantages of secondary networks? Name two disadvantages.
Question: For the distribution substation given in Problem 14.9, assume that each of the four circuit breakers on the 12.5-kV side of the distribution substation transformers has a maximum continuous current of 2000A/phase during both normal and emergency conditions. Determine the summer allowable substation rating under the single-contingency loss of one transformer, based on not exceeding the maximum continuous current of these circuit breakers at 12.5-kV operating voltage. Assume a 5% reduction for unequal transformer loadings. Comparing the results of this problem with Problem 14.9, what limits the substation allowable rating, the circuit breakers or the transformers?
Using the Internet, name three cities in the Western Interconnection of the United States that have secondary network systems.
What do you think about this solution?
We value your feedback to improve our textbook solutions.