What about running the line at 300 units per day? If overtime were used with the engineers’ initial design, how much time would the line need to be run each day?

Short Answer

Expert verified

To achieve a daily production of 300 units, 2.5 hours of extra would be required.

Step by step solution

01

The running the line at 300 units per day

Running the line at 250 units per day as well as if extra was used with the engineers' original concept. However, if this firm can exceed its target of 250 units as well as reach 300 units, it may be worth the additional effort/expense they have to invest in the organization.

02

Explanation

With the engineers' original design, an extra 2.5 hours would result in a line running at 300 units per day. It is demonstrated in the following method of calculating:

T=7.5hours+2.5hoursofovertime×60×602minutesperunitT=3600seconds1200secondsperunitT=300units

As a result, the original design produces 30 units each hour. To achieve a daily production of 300 units, 2.5 hours of overtime would be required.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Study anywhere. Anytime. Across all devices.

Sign-up for free