Warning: foreach() argument must be of type array|object, bool given in /var/www/html/web/app/themes/studypress-core-theme/template-parts/header/mobile-offcanvas.php on line 20

This is a way to shorten the cycle time for an assembly line that has a task time that is longer than the desired cycle time. Assume that it is not possible to speed up the task, split the task, use it over time, or redesign the task.

Short Answer

Expert verified

It may be required to divide the activity among two workstations that execute in parallel.

Step by step solution

01

Parallel workstations

The enormous manufacturing that is comparable in the item as well as dynamic time in an operating unit, parallel workstations are produced on the similar assembly line is alluded as parallel workstations.

02

This is a way to shorten the cycle time for an assembly line that has a task time that is longer than the desired cycle time. Assume that it is not possible to speed up the task, split the task, use it over time, or redesign the task is using a parallel workstation

Parallel workstations are duplicated operational workstations in integrated assembly lines that build various kinds of goods with high functional compatibility at the same period without any extra installation time. There are numerous approaches intended to eliminate excess workstations while maximizing smoothness among such parallel workstations.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Study anywhere. Anytime. Across all devices.

Sign-up for free