Chapter 3: Q6OQ (page 417)
What is the term used for a company moving management of the complete cycle of material flow to an outside provider?
Short Answer
Logistics outsourcing.
Chapter 3: Q6OQ (page 417)
What is the term used for a company moving management of the complete cycle of material flow to an outside provider?
Logistics outsourcing.
All the tools & learning materials you need for study success - in one app.
Get started for freeThe periodic inspection and repair of equipment designed to keep the equipment reliable, thus eliminating unplanned downtime due to malfunctions is called ________.
Refer to Example 14.1 as the basis for this problem. Meritor hires a team of consultants. The consultants suggest partial robotic automation as well as an increase in safety stock to 12.5 percent. Meritor implements these suggestions. The result is an increase in efficiency in both the fabrication of muffler assembly and the making of catalytic converters. The muffler assembly fabrication cell now averages 16 assemblies per hour and the lead time has been decreased to two hours’ response time for a batch of 10 catalytic converters. How many kanban cards are now needed?
In some JIT systems, marked spaces on a table or the floor identify where material should be stored. Supplying operations are signaled to produce more when the space is empty. What are these spaces called?
A technique that is useful for screening potential locations for services.
A supply chain that must deal with high levels of both supply and demand uncertainty.
What do you think about this solution?
We value your feedback to improve our textbook solutions.