Question:Blanchette Plant Service completed a special landscaping job for Kerry Company. Blanchette uses ABC and has the following predetermined overhead allocation rates:

Activity Predetermined

Allocation Base Overhead Allocation Rate

Designing Number of designs \( 290 per design

Planting Number of plants \) 20 per plant

The Kerry job included \(750 in plants; \)1,300 in direct labor; one design; and 30 plants.

Requirements

3. If Blanchette desires an operating income of 30% of cost, how much should the company charge for the Kerry job?

Short Answer

Expert verified

Answer

Sales price: $2,847

Step by step solution

01

Full product cost

Full product cost is the total cost relating to developing, producing, and delivering the product or services. It includes all the pre-production, during-production, and post-production costs.

Full product cost is used to determine the sales price under cost-based pricing.

02

Computation of sales price

Salesprice=Totalcost+(100+costpercent)100=$2,190×130100=$2,847

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Refer to Exercises E19-20 and E19-21. Controller Michael Bender is surprised by the increase in cost of the deluxe model under ABC. Market research shows that for the deluxe rim to provide a reasonable profit, Eason will have to meet a target manufacturing cost of \(625.00 per rim. A value engineering study by Eason’s employees suggests that modifications to the finishing process could cut finishing cost from \)90.00 to \(60.00 per hour and reduce the finishing direct labor hours per deluxe rim from 5.50 hours to 5.0 hours. Direct materials would remain unchanged at \)48.00 per rim, as would direct labor at $52.00 per rim. The materials handling, machine setup, and insertion of parts activity costs also would remain the same.

Would implementing the value engineering recommendation enable Eason to achieve its target cost for the deluxe rim?

Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

1. Compute the total estimated indirect manufacturing cost for 2018.

The Alexander Manufacturing Company in Rochester, Minnesota, assembles and tests electronic components used in smartphones. Consider the following data regarding component T24 (amounts are per unit):

Direct materials cost \( 81.00

Direct labor cost 21.00

Activity-based costs allocated ?

Total manufacturing product cost ?

The activities required to build the component follow:

Activity

Allocation Base

Cost Allocated to Each Unit

Start Station

Number of raw component chassis

3 X \)1.50 = \(4.50

Dip Insertion

Number of dip insertions

? X 0.50 = 14.50

Manual Insertion

Number of manual insertions

13 X 0.40 = ?

Wave solder

Number of components solders

3 X 1.50 = 4.50

Backload

Number of backload insertions

7 X ? = 2.80

Test

Number of testing hours

0.39 60.0 = ?

Defect analysis

Number of defect analysis hours

0.10 X ? = 4.00

Total activity-based costs

\) ?

Requirements

2. Why might managers favor this ABC system instead of Alexander’s older system, which allocated all manufacturing overhead costs on the basis of direct labor hours?

Koehler (see Exercise E19-15 and Exercise E19-16) makes handheld calculators in two models—basic and professional—and wants to further refine its costing system by allocating overhead using activity-based costing. The estimated \(721,000 of manufacturing overhead has been divided into three primary activities: Materials Handling, Machine Setup, and Insertion of Parts. The following data have been compiled:

Material Handling

Machine Setup

Insertion of Parts

Total

Overhead costs

\) 45,000

\( 136,000

\) 540,000

$ 721,000

Allocation base

Number of parts

Number of setups

Number of parts

Expected usage:

Basic Model

32 parts per calculator

24 setups per year

32 parts per calculator

Professional

Model

58 parts per calculator

44 setups per year

58 parts per calculator

Requirement 2

Compare your answers for Exercise E19-15, Exercise E19-16, and Exercise E19-17. What conclusions can you draw?

Question:Western, Inc. is a technology consulting firm focused on Web site development and integration of Internet business applications. The president of the company expectsto incur \(640,000 of indirect costs this year, and she expects her firm to work 4,000direct labor hours. Western’s systems consultants provide direct labor at a rate of \)280per hour. Clients are billed at 160% of direct labor cost. Last month, Western’s consultantsspent 170 hours on Halbert’s engagement.

Requirements

1. Compute Western’s predetermined overhead allocation rate per direct labor hour.

2. Compute the total cost assigned to the Halbert engagement.

3. Compute the operating income from the Halbert engagement.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free