Explain how the work cell manufacturing layout increases productivity.

Short Answer

Expert verified

Work cell manufacturing layout increases productivity by eliminating work in process, reducing wastage, and having less supervision in the manufacturing process.

Step by step solution

01

Work cell

A work cell under JIT is an area that provides everything needed for the manufacturing process. A work cell is accompanied by required machinery and labor resources.

02

Increased productivity under work cell manufacturing layout

Unlike the traditional manufacturing system, the work cell layout does not separate the production process into separate departments. Under work cell employees work in a team and complete the work without any supervision. Production is done in small batches of units and quality inspection is done throughout the process. As soon as the finished product is moved out of the work cell, and the more raw material is procured for the supplier just in time. So, in this way, there is no work in process inventory in this system.

Thus, in this way, a demand-pull system works under a work cell layout that reduces waste and increases production without moving the work in process.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

โ€œPrevention is much cheaper than external failure.โ€ Do you agree with this statement? Why or why not?

Question:Stella, Inc. is using a costs-of-quality approach to evaluate design engineering efforts for a new skateboard. Stellaโ€™s senior managers expect the engineering work to reduce appraisal, internal failure, and external failure activities. The predicted reductions in activities over the two-year life of the skateboards follow. Also shown are the predetermined overhead allocation rates for each activity.

Activity Predicted Predetermined

Reduction in Overhead Allocation

Activity Units Rate per Unit

Inspection of incoming raw materials 390 \( 44

Inspection of finished goods 390 19

Number of defective units discovered in-house 1,200 50

Number of defective units discovered by customers 325 72

Lost profits due to dissatisfied customers 75 102

Requirements

2. Stella spent \)103,000 on design engineering for the new skateboard. What is the net benefit of this โ€œpreventiveโ€ quality activity?

Willitte Pharmaceuticals manufactures an over-the-counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health care facilities and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system would be beneficial:

Activity Estimated Estimated Quantity

Indirect Cost Allocation Base of Allocation Base

Materials handling \( 95,000 Number of kilos 19,000 kilos

Packaging 200,000 Number of machine hours 5,000 hours

Quality assurance 112,500 Number of samples 1,875 samples

Total indirect costs \) 407,500

Actual production information includes the following:

Commercial Containers Travel Packs

Units produced 2,400 containers 50,000 packs

Weight in kilos 9,600 5,000

Machine hours 1,680 500

Number of samples 240 750

Requirements

3. Use the predetermined overhead allocation rates to compute the activity-based costs per unit of the commercial containers and the travel packs. Round to two decimal places. (Hint: First compute the total activity-based costs allocated to each product line, and then compute the cost per unit.)

Clason, Inc. manufactures door panels. Suppose Clason is considering spending the following amounts on a new total quality management (TQM) program:

___________________________________________________________________

Strength-testing one item from each batch of panels \( 68,000

Training employees in TQM 27,000

Training suppliers in TQM 39,000

Identifying suppliers who commit to on-time delivery of

perfect-quality materials 58,000

Clason expects the new program would save costs through the following:

___________________________________________________________________

Avoid lost profits from lost sales due to disappointed customers \) 86,000

Avoid rework and spoilage 63,000

Avoid inspection of raw materials 57,000

Avoid warranty costs 15,000

Requirements

1. Classify each cost as a prevention cost, an appraisal cost, an internal failure cost, or an external failure cost.

2. Should Clason implement the new quality program? Give your reason.

Answer

The following information is provided for Orbit Antenna Corp., which manufactures two products: Lo-Gain antennas and Hi-Gain antennas for use in remote areas.

Activity Cost Allocation Base

Setup \( 58,000 Number of setups

Machine maintenance 30,000 Number of machine hours

Total indirect manufacturing costs \) 88,000

Lo-Gain Hi-Gain Total

Direct labor hours 1,200 3,800 5,000

Number of setups 40 40 80

Number of machine hours 3,000 2,000 5,000

Orbit Antenna plans to produce 125 Lo-Gain antennas and 225 Hi-Gain antennas.

Requirements

1. Compute the indirect manufacturing cost per unit using direct labor hours for the single plantwide predetermined overhead allocation rate.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free