The following information is provided for Orbit Antenna Corp., which manufactures two products: Lo-Gain antennas and Hi-Gain antennas for use in remote areas.

Activity Cost Allocation Base

Setup \( 58,000 Number of setups

Machine maintenance 30,000 Number of machine hours

Total indirect manufacturing costs \) 88,000

Lo-Gain Hi-Gain Total

Direct labor hours 1,200 3,800 5,000

Number of setups 40 40 80

Number of machine hours 3,000 2,000 5,000

Orbit Antenna plans to produce 125 Lo-Gain antennas and 225 Hi-Gain antennas.

Requirements

1. Compute the indirect manufacturing cost per unit using direct labor hours for the single plantwide predetermined overhead allocation rate.

Short Answer

Expert verified

Per unit indirect cost

For Lo-Gain:$168.96

For Hi-Gain: $297.24

Step by step solution

01

Computation of predetermined overhead rate under single plantwide allocation

predeterminedoverheadrate=totalindirectmanufacturingcosttotaldirectlaborhours=$88,0005,000=$17.6

02

Computation of per unit indirect cost for Lo-Gain

perunitindirectcost=predeterminedoverheadrate×no.ofdirectlaborhourrequiredno.ofunitsproduced=$17.6×1,200125=$21,120125=$168.96

03

Computation of per unit indirect cost for Hi-Gain

perunitindirectcost=predeterminedoverheadrate×no.ofdirectlaborhourrequiredno.ofunitsproduced=$17.6×3,800225=$66,880225=$297.24

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Activity-based costing requires four steps. List the four steps in the order they are performed.

Bubba and Danny are college friends planning a skiing trip to Killington before the New Year. They estimated the following for the trip:

Estimated Activity Allocation

Costs Allocation Base Bubba Danny

Food \( 400 Pounds of food eaten 24 26

Skiing 300 Number of lift tickets 2 0

Lodging 280 Number of nights 2 2

\) 980

Requirements

1. Bubba suggests that the costs be shared equally. Calculate the amount each person would pay.

What are quality improvement programs?

The Alexander Manufacturing Company in Rochester, Minnesota, assembles and tests electronic components used in smartphones. Consider the following data regarding component T24 (amounts are per unit):

Direct materials cost \( 81.00

Direct labor cost 21.00

Activity-based costs allocated ?

Total manufacturing product cost ?

The activities required to build the component follow:

Activity

Allocation Base

Cost Allocated to Each Unit

Start Station

Number of raw component chassis

3 X \)1.50 = \(4.50

Dip Insertion

Number of dip insertions

? X 0.50 = 14.50

Manual Insertion

Number of manual insertions

13 X 0.40 = ?

Wave solder

Number of components solders

3 X 1.50 = 4.50

Backload

Number of backload insertions

7 X ? = 2.80

Test

Number of testing hours

0.39 60.0 = ?

Defect analysis

Number of defect analysis hours

0.10 X ? = 4.00

Total activity-based costs

\) ?

Requirements

1. Complete the missing items for the two tables.

Harris Systems specializes in servers for workgroup, e-commerce, and ERP applications. The company’s original job costing system has two direct cost categories: direct materials and direct labor. Overhead is allocated to jobs at the single rate of \(22 per direct labor hour.

A task force headed by Harris’s CFO recently designed an ABC system with four activities. The ABC system retains the current system’s two direct cost categories. Overhead costs are reflected in the four activities. Pertinent data follow:

___________________________________________________________________

Activity Allocation Base Predetermined Overhead

Allocation Rate____

Materials handling Number of parts \) 0.85

Machine setup Number of setups 500.00

Assembling Number of assembling hours 80.00

Shipping Number of shipments 1,500.00_______

Harris Systems has been awarded two new contracts, which will be produced as Job A and Job B. Budget data relating to the contracts follow:

____________________________________________________________

Job A Job B__

Number of parts 15,000 2,000

Number of setups 6 4

Number of assembling hours 1,500 200

Number of shipments 1 1

Total direct labor hours 8,000 600

Number of units produced 100 10

Direct materials cost \( 220,000 \) 30,000

Direct labor cost \( 160,000 \) 12,000__

Requirements

2. Suppose Harris Systems adopts the ABC system. Compute the budgeted product cost per unit for each job using ABC.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free