Loiselle manufactures high-quality speakers. Suppose Loiselle is considering spending the following amounts on a new quality program:

___________________________________________________________________

Additional 20 minutes of testing for each speaker \( 625,000

Negotiating and training suppliers to obtain higher-quality

materials and on-time delivery 430,000

Redesigning the speakers to make them easier to manufacture 1,250,000

Loiselle expects this quality program to save costs as follows:

__________________________________________________

Reduce warranty repair costs \) 275,000

Avoid inspection of raw materials 580,000

Avoid rework because of fewer defective units 825,000_

It also expects this program to avoid lost profits from the following:

___________________________________________________

Lost profits due to disappointed customers $ 920,000

Lost production time due to rework 278,000

Requirements

1. Classify each of these costs into one of the four categories of quality costs (prevention, appraisal, internal failure, or external failure).

2. Should Loiselle implement the quality program? Give your reasons.

Short Answer

Expert verified

The cost of taking the quality improvement programs is $2,305,000. The cost of not taking the improvement programs is $2,878,000. So it is advisable to take the improvement program.

Step by step solution

01

Classification of costs

Prevention Costs –

i)Negotiating and training suppliers to obtain higher-quality materials and on-time delivery

ii)Redesigning the speakers to make them easier to manufacture

Appraisal Cost –

i) Additional 20 minutes of testing for each speaker

Internal Failure Costs –

i) Avoid inspection of raw materials

ii) Avoid rework because of fewer defective units

External Failure Costs –

i) Reduce warranty repair costs

ii) Lost profits due to disappointed customers

iii) Lost production time due to rework

02

Analysis of quality improvement programs

Undertake the Quality Improvement Program_____________

Prevention

Negotiating and training suppliers to

obtain higher-quality materials and

on-time delivery $430,000

Redesigning the speakers to make

them easier to manufacture $1,250,000

Total Prevention Costs $1,680,000

Appraisal

Additional 20 minutes of testing for each speaker $625,000

Total Appraisal Costs $625,000

Total cost of undertaking the quality improvement programs $2,305,000

Do not undertake the Quality Improvement Program_____________

Internal Failure

Avoid inspection of raw materials $580,000

Avoid rework because of fewer defective $825,000

Total Internal Failure Costs $1,405,000

External Failure

Reduce warranty repair costs $275,000

Lost profits due to disappointed customers $920,000

Lost production time due to rework $278,000

Total Appraisal Costs $1,473,000

Total cost of undertaking the quality improvement programs $2,878,000

As it can be seen from the above analysis, if quality improvement programs are taken Clason can save $573,000 cost.

So it is advisable to take the quality improvement programs.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Bubba and Danny are college friends planning a skiing trip to Killington before the new year. They estimated the following for the trip:

Estimated Activity Allocation

Costs Allocation Base Bubba Danny

Food \( 400 Pounds of food eaten 24 26

Skiing 300 Number of lift tickets 2 0

Lodging 280 Number of nights 2 2

\) 980

Requirements

2. Danny does not like the idea of sharing the costs equally because he plans to stay in the room rather than ski. Danny suggests that each type of cost be allocated to each person based on the above-listed allocation bases. Using the activity allocation for each person, calculate the amount that each person would pay based on his own consumption of the activity.

Harris Systems specializes in servers for workgroup, e-commerce, and ERP applications. The company’s original job costing system has two direct cost categories: direct materials and direct labor. Overhead is allocated to jobs at the single rate of \(22 per direct labor hour.

A task force headed by Harris’s CFO recently designed an ABC system with four activities. The ABC system retains the current system’s two direct cost categories. Overhead costs are reflected in the four activities. Pertinent data follow:

___________________________________________________________________

Activity Allocation Base Predetermined Overhead

Allocation Rate____

Materials handling Number of parts \) 0.85

Machine setup Number of setups 500.00

Assembling Number of assembling hours 80.00

Shipping Number of shipments 1,500.00_______

Harris Systems has been awarded two new contracts, which will be produced as Job A and Job B. Budget data relating to the contracts follow:

____________________________________________________________

Job A Job B__

Number of parts 15,000 2,000

Number of setups 6 4

Number of assembling hours 1,500 200

Number of shipments 1 1

Total direct labor hours 8,000 600

Number of units produced 100 10

Direct materials cost \( 220,000 \) 30,000

Direct labor cost \( 160,000 \) 12,000__

Requirements

1. Compute the budgeted product cost per unit for each job, using the original costing system (with two direct cost categories and a single overhead allocation rate).

Jaunkas Corp. manufactures mid-fi and hi-fi stereo receivers. The following data have been summarized:

Mid-Fi Hi-Fi

Direct materials cost per unit \( 400 \) 1,800

Direct labor cost per unit 600 400

Indirect manufacturing cost per unit ? ?

Indirect manufacturing cost information includes the following:

Activity

Predetermined

Overhead

Allocation Rate

Mid-Fi

Hi-Fi

Setup

\( 1,400 per setup

36 setups

36 setups

Inspection

\) 700 per inspection hour

35 inspection hours

20 inspection hours

Machine maintenance

$ 13 per machine hour

1,900 machine hours

1,150 machine hours

The company plans to manufacture 125 units of the mid-fi receivers and 250 units of the hi-fi receivers. Calculate the product cost per unit for both products using activity-based costing.

Malone Company has adopted a JIT management system and has the following transactions in August:

a. Purchased raw materials on account, \(50,000.

b. Incurred labor and overhead costs, \)70,000.

c. Completed 500 units with standard costs of \(95 for direct materials and \)150 for conversion costs.

d. Sold on account 475 units for $300 each.

10. Record the journal entries for Malone Company for August.

11. Open a T-account for Conversion Costs

The Alexander Manufacturing Company in Rochester, Minnesota, assembles and tests electronic components used in smartphones. Consider the following data regarding component T24 (amounts are per unit):

Direct materials cost \( 81.00

Direct labor cost 21.00

Activity-based costs allocated ?

Total manufacturing product cost ?

The activities required to build the component follow:

Activity

Allocation Base

Cost Allocated to Each Unit

Start Station

Number of raw component chassis

3 X \)1.50 = \(4.50

Dip Insertion

Number of dip insertions

? X 0.50 = 14.50

Manual Insertion

Number of manual insertions

13 X 0.40 = ?

Wave solder

Number of components solders

3 X 1.50 = 4.50

Backload

Number of backload insertions

7 X ? = 2.80

Test

Number of testing hours

0.39 60.0 = ?

Defect analysis

Number of defect analysis hours

0.10 X ? = 4.00

Total activity-based costs

\) ?

Requirements

1. Complete the missing items for the two tables.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free