Refer to Exercises E19-20 and E19-21. Controller Michael Bender is surprised by the increase in cost of the deluxe model under ABC. Market research shows that for the deluxe rim to provide a reasonable profit, Eason will have to meet a target manufacturing cost of \(625.00 per rim. A value engineering study by Eason’s employees suggests that modifications to the finishing process could cut finishing cost from \)90.00 to \(60.00 per hour and reduce the finishing direct labor hours per deluxe rim from 5.50 hours to 5.0 hours. Direct materials would remain unchanged at \)48.00 per rim, as would direct labor at $52.00 per rim. The materials handling, machine setup, and insertion of parts activity costs also would remain the same.

Would implementing the value engineering recommendation enable Eason to achieve its target cost for the deluxe rim?

Short Answer

Expert verified

The value engineering program can be implemented as the new cost is lower than the target cost.

New cost: $524.4

Step by step solution

01

New finishing cost as per value engineering program

Finishingcost=Revisedfinishingrate×RevisedFinishingdirectlaborhour=$60×5=$300

02

Computation of total indirect cost

Perrimmaterialhandlingcost=Predeterminedoverheadallocationrate×Numberofpartsperunit=$4×7=$28PerrimMachinesetupcost=Predeterminedoverheadallocationrate×Numberofsetupsper500units500=$400×18500=$14.4Perriminsertionofpartscost=Predeterminedoverheadallocationrate×Numberofpartsperunit=$26×7=$182Perrimindirectforstandardmodel=Materialhandlingcost+Machinesetupcost+Insertionofpartscost+Finishingcost=$28+$14.4+$182+$300=$524.4

The New per rim cost for the deluxe rim amounts to $524.4. This cost is lower than the target cost. So it is recommended to implement the value engineering program.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

What are the inventory accounts used in JIT costing?

Martin, Inc. manufactures bookcases and uses an activity-based costing system. Martin’s activity areas and related data follow:

Activity

Budgeted Cost of Activity

Allocation Base

Predetermined Overhead Allocation Rate

Materials handling

\( 230,000

Number of parts

\)1.50

Assembly

3,200,000

Number of assembling direct labor hours

16.00

Finishing

150,000

Number of finished units*

3.00

*Refers to the number of units receiving the finishing activity, not the number of units transferred to Finished Goods Inventory

Martin produced two styles of bookcases in April: the standard bookcase and an unfinished bookcase, which has fewer parts and requires no finishing. The totals for quantities, direct materials costs, and other data follow:

Product

Total Units Produced

Total Direct materials Costs

Total Direct Labor Costs

Total Number of Parts

Total Assembling Direct Labor Hours

Standard bookcase

3,000

\(54,000

\)67,500

9,000

4,500

Unfinished bookcase

3,500

56,000

52,500

7,000

3,500

Requirements

2. Suppose that pre-manufacturing activities, such as product design, were assigned to the standard bookcases at \(5 each and to the unfinished bookcases at \)3 each. Similar analyses were conducted of post-manufacturing activities such as distribution, marketing, and customer service. The post-manufacturing costs were \(24 per standard bookcase and \)18 per unfinished bookcase. Compute the full product costs per unit.

Define value engineering. How is it used to control costs?

Question:Refer to Exercise E19-26. Western desires a 20% target net profit after covering all costs. Considering the total costs assigned to the Halbert engagement in Exercise E19-26, what would Western have to charge the customer to achieve that net profit? Roundto two decimal places.

Harcourt Pharmaceuticals manufactures an over-the-counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health care facilities and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system would be beneficial:

Activity Estimated Estimated Quantity

Indirect Cost Allocation Base of Allocation Base

Materials handling \( 96,000 Number of kilos 24,000 kilos

Packaging 210,000 Number of machine hours 3,000 hours

Quality assurance 114,000 Number of samples 1,900 samples

Total indirect costs \) 420,000

Other production information includes the following:

Commercial Containers Travel Packs

Units produced 2,800 containers 51,000 packs

Weight in kilos 9,800 5,100

Machine hours 1,960 510

Number of samples 560 765

Requirements

1. Harcourt’s original single plantwide overhead allocation rate system allocated indirect costs to products at $140.00 per machine hour. Compute the total indirect costs allocated to the commercial containers and to the travel packs under the original system. Then compute the indirect cost per unit for each product. Round to two decimal places.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free