The usefulness of a single plantwide overhead rate is based on two assumptions. What are those assumptions?

Short Answer

Expert verified

Multiple allocations and various sections of the organization are the assumptions followed by the plantwide overhead rate.

Step by step solution

01

Meaning of Plant wide Overhead

Plant overhead distribution is calculated using volume-based pointers such as coordinate work or machine hours. The strategy works well for small businesses that have predictable costs.

02

Explaining the assumptions of a single plantwide overhead rate.

Following are the assumptions of the plantwide overhead rate.

  1. There are so few overheads to allocate that multiple allocation rates are unnecessary to achieve a higher level of allocation accuracy;
  2. The services supplied by the various sections of the organization are fairly comparable.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Cardiff and Delp is an architectural firm that provides services for residential construction projects. The following data pertain to a recent reporting period.

Activities Costs

Design department

Client consultation โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. 1,500 contact hours \( 270,000

Drawings โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 2,000 design hours 115,000

Modeling โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 40,000 square feet 30,000

Project management department

Supervision โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 600 days \)120,000

Billing โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. 8 jobs 10,000

Collections โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 8 jobs 12,000

Required

1. Using ABC, compute the firmโ€™s activity overhead rates. Form activity cost pools where appropriate.

2. Assign costs to a 9,200-square-foot job that requires 450 contact hours, 340 design hours, and 200 days to complete.

SP 17 After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey wondered if it was time to critically analyze overhead costs at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of its overhead. Additional information about overhead follows.

Activity Cost Driver

Setting up machines โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. \( 20,000 25 batches

Inspecting components โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ \) 7,500 5,000 parts

Providing utilities โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ \( 10,000 5,000 machine hours

Overhead has been applied to output at a rate of 50% of direct labor costs. The following data pertain to Job 615.

Direct materials โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. \)2,500

Direct labor โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. $3,500

Batches โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ. 2 batches

Number of parts โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. 400 parts

Machine hours โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ. 600 machine hours

Required

1. Classify each of its three overhead activities as unit level, batch level, product level, or facility level.

2. What is the total cost of Job 615 if Business Solutions applies overhead at 50% of direct labor cost?

3. What is the total cost of Job 615 if Business Solutions uses activity-based costing?

4. Which approach to assigning overhead gives a better representation of the costs incurred to produce Job 615? Explain.

The following data are for the two products produced by Tadros Company.

Product A Product B

Direct materials โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ \(15 per unit \)24 per unit

Direct labor hours โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 0.3 DLH per unit 1.6 DLH per unit

Machine hours โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. 0.1 MH per unit 1.2 MH per unit

Batches โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ... 125 batches 225 batches

Volume โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ. 10,000 units 2,000 units

Engineering modifications โ€ฆโ€ฆโ€ฆ.. 12 modifications 58 modifications

Number of customers โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 500 customers 400 customers

Market price โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ.. \(30 per unit \)120 per unit

The companyโ€™s direct labor rate is \(20 per direct labor hour (DLH). Additional information follows.

Costs Driver

Indirect manufacturing

Engineering support โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ \)24,500 Engineering modifications

Electricity โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 34,000 Machine hours

Setup costs โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ 52,500 Batches

Nonmanufacturing

Customer service โ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆโ€ฆ. 81,000 Number of customers

Required

1. Compute the manufacturing cost per unit using the plantwide overhead rate based on direct labor hours. What is the gross profit per unit?

2. How much gross profit is generated by each customer of Product A using the plantwide overhead rate? How much gross profit is generated by each customer of Product B using the plantwide overhead rate? What is the cost of providing customer service to each customer? What information is provided by this comparison?

3. Determine the manufacturing cost per unit of each product line using ABC. What is the gross profit per unit?

4. How much gross profit is generated by each customer of Product A using ABC? How much gross profit is generated by each customer of Product B using ABC? Is the gross profit per customer adequate?

5. Which method of product costing gives better information to managers of this company? Explain why.

What are three common methods of assigning overhead costs to a product?

In what way are departmental overhead rates similar to a single plantwide overhead rate? How are they different?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free